GMP cleanroom laboratories, Spalding, Lincolnshire

Projects

GMP cleanroom laboratories, Spalding

A controlled-environment facility built inside an existing warehouse for a CBD oil manufacturer, validated to ISO 14644-1 before handover.

Value
£3.8m
Programme
18 months
Standard
EU GMP Grade D / ISO 8
Completed
2023

Challenge

Pharmaceutical-standard cleanrooms, laboratories and offices, all built, serviced and proven to standard inside one warehouse shell.

Approach

A cleanroom is programmed backwards from validation. The air handling, filtration and humidity control were installed, balanced and stable before the rooms were tested, so the M&E sequence drove the fit-out trades.

Result

Completed on an 18-month build. Cleanrooms validated to ISO 14644-1 at handover.

Scope

  • EU GMP Grade D cleanrooms (ISO 8 equivalent)
  • CNC and non-classified laboratories
  • Mezzanine, offices, canteen and double-height reception
  • Four air handling units with HEPA filtration and humidification
  • CO2 pipework and cleanroom doors
  • Validation testing to ISO 14644-1

Project manager, delivered with WorkBox.